Log In | Contact Us| View Cart (0)
Browse: Collections Digital Content Subjects Creators Record Groups

Estelle M. Isakson Collection

Overview

Scope and Contents

Biographical Note

Detailed Description

Box 1



Contact us about this collection

Estelle M. Isakson Collection, 1919-1927 | UNA Archives and Special Collections

By Dixie Norwood

Printer-friendly Printer-friendly | Email Us Contact Us About This Collection

Collection Overview

Title: Estelle M. Isakson Collection, 1919-1927Add to your cart.

Primary Creator: Estelle M. Isakson Collection, 1919-1927

Extent: 1.0 Boxes

Scope and Contents of the Materials

This collection contains very detailed photographs of the construction of Wilson Dam.

Biographical Note

Estelle M. Isakson's father, Albert Henry Rodes worked on the Wilson Dam during the 1920s.

Box and Folder Listing


Browse by Box:

[Box 1],
[All]

Box 1Add to your cart.
Item 1: Model Section, Wilson Dam & Power House (No Date)Add to your cart.
Item 2: View of track across river (March 14, 1920)Add to your cart.
Item 3: View of construction barge clearing debris from in front of construction are (No Date)Add to your cart.
Item 4: Power House construction (No Date)Add to your cart.
Item 5: Men working on early spillway construction (April 4, 1920)Add to your cart.
Item 6: Aerial view of construction of Wilson Dam (August 19, 1920)Add to your cart.
Item 7: View of early construction (No Date)Add to your cart.
Item 8: Possible flooding and debris noted in front of early spillway construction (March 29, 1920)Add to your cart.
Item 9: Model Section, Wilson Dam & Power House (No Date)Add to your cart.
Item 10: Wilson Dam, Muscle Shoals, Tennessee River (No Date)Add to your cart.
Item 11: Wilson Dam-General Section showing method of placing concrete (No Date)Add to your cart.
Item 12: Started pouring{concrete}at 9:55 a.m. (March 22, 1923)Add to your cart.
Item 13: Studying the layout of the land (No Date)Add to your cart.
Item 14: A view from the tracks (No Date)Add to your cart.
Item 15: Another view from the tracks (No Date)Add to your cart.
Item 16: Empty carts waiting for loads on tracks (No Date)Add to your cart.
Item 17: Men working on spillway construction (No Date)Add to your cart.
Item 18: Clearing rocks and making headway (No Date)Add to your cart.
Item 19: Early view of construction (No Date)Add to your cart.
Item 20: A view from high atop the rocks overlooking the tracks and river (No Date)Add to your cart.
Item 21: A maze of tracks (No Date)Add to your cart.
Item 22: The view north (No Date)Add to your cart.
Item 23: Work in progress (No Date)Add to your cart.
Item 24: A close-up of construction (No Date)Add to your cart.
Item 25: The back side of construction (No Date)Add to your cart.
Item 26: View of north abutment showing forms being placed for non-overflow section (February 2, 1923)Add to your cart.
Item 27: Bridge in the channel between Jackson Island and the south abutment (November 24, 1919)Add to your cart.
Item 28: Work continues in the woodyard (No Date)Add to your cart.
Item 29: Work continues on the Power House (No Date)Add to your cart.
Item 30: Inside view of the construction with river in the distance (No Date)Add to your cart.
Item 31: Cranes help get the job done (No Date)Add to your cart.
Item 32: Men work to clear rocks out of the way (No Date)Add to your cart.
Item 33: Inside view of possible Power House site (No Date)Add to your cart.
Item 34: Power House section-view shows completed battered face of upstream side of unit #2 (April 1, 1923)Add to your cart.
Item 35: That’s a lot of rocks to clear (July 23, 1920)Add to your cart.
Item 36: A tree-line view of early construction (No Date)Add to your cart.
Item 37: Two men posing for a picture on the tracks (No Date)Add to your cart.
Item 38: Two men studying the track with a view of the lock in the distance (No Date)Add to your cart.
Item 39: The view of weighted down carts on the tracks (April 4, 1920)Add to your cart.
Item 40: View of early construction with two men on a barge (No Date)Add to your cart.
Item 41: View of early progress on a portion on dam (No Date)Add to your cart.
Item 42: The help of barges to clear the area for construction (No Date)Add to your cart.
Item 43: Men taking a break from their work (No Date) (X4)Add to your cart.
Item 44: Close-up of Spillway stall construction (No Date)Add to your cart.
Item 45: A river view of continued work on spillway section (No Date)Add to your cart.
Item 46: Spillway construction continues (No Date)Add to your cart.
Item 47: Early view of construction on spillway section (No Date)Add to your cart.
Item 48: Crane work continues on the spillway section (No Date)Add to your cart.
Item 49: Early construction of spillway section (No Date)Add to your cart.
Item 50: Very early construction of spillway section (No Date)Add to your cart.
Item 51: Power House section-view of upstream side of power house showing penstock forms in place (March 1, 1923)Add to your cart.
Item 52: Sluiceway section Construction bridge-connection obstructing discharge from sluiceway (August 14, 1924)Add to your cart.
Item 53: Sluiceway section-water from sluiceway obstructed by bridge below (August 13, 1924)Add to your cart.
Item 54: Early construction of wooden structures (No Date) (x2)Add to your cart.
Item 55: Men working diligently on wooden structure (No Date)Add to your cart.
Item 56: Sluice section-interior view sluice lining (March 18, 1924)Add to your cart.
Item 57: Power House section east end of draft tube chamber showing first type of bell construction (February 13-no year noted)Add to your cart.
Item 58: Men taking a break to study their next move (No Date)Add to your cart.
Item 59: View of track with working men in distance (No Date)Add to your cart.
Item 60: Work continues on the concrete sections of Wilson Dam (No Date)Add to your cart.
Item 61: Power House Section-View shows completed section of scroll case flooring, block 86 and forms being placed for south auxiliary unit (April 1, 1923) {several photos alike/several photos of similar view}Add to your cart.
Item 62: Aerial view of continuing construction of Wilson Dam (No Date)Add to your cart.
Item 63: Aerial view of continuing construction of Wilson Dam (No Date)Add to your cart.
Item 64: River view (close-up) of continued work on spillway (No Date)Add to your cart.
Item 65: A man stands atop a trailer to view the progress of construction (No Date)Add to your cart.
Item 66: A close-up view of concrete columns (No Date)Add to your cart.
Item 67: Power House Section-Intake showing stop in place (August 4, 1924)Add to your cart.
Item 68: Early view of construction of power house (No Date)Add to your cart.
Item 69: Close up view of spillway construction (No Date)Add to your cart.
Item 70: A man works on a portion of the spillway (No Date)Add to your cart.
Item 71: An empty rail cart sits waiting on top of an early constructed part of Wilson Dam (No Date)Add to your cart.
Item 72: Wood work continues (No Date)Add to your cart.
Item 73: Men continue pouring concrete to one section of Wilson Dam (No Date)Add to your cart.
Item 74: Aerial view of continued construction on power house of Wilson Dam (No Date)Add to your cart.
Item 75: Aerial view of continued construction on power house of Wilson Dam (No Date)Add to your cart.
Item 76: Power House Section-General view of power house from top of bluff, south side (April 1, 1923)Add to your cart.
Item 77: Similar view of Power House construction (No Date)Add to your cart.
Item 78: Close-up view of construction inside Power House section of Wilson Dam (No Date)Add to your cart.
Item 79: Close-up view of construction inside Power House section of Wilson Dam (No Date)Add to your cart.
Item 80: Early construction views of Power House section of Wilson Dam (No Date)Add to your cart.
Item 81: Early construction views of Power House section of Wilson Dam (No Date)Add to your cart.
Item 82: Early construction views of Power House section of Wilson Dam (No Date)Add to your cart.
Item 83: Early construction views of Power House section of Wilson Dam (No Date)Add to your cart.
Item 84: Bluff view of early construction of Wilson Dam (No Date)Add to your cart.
Item 85: A bird’s eye view of the construction of the spillway (No Date)Add to your cart.
Item 86: Aerial view of early construction (No Date)Add to your cart.
Item 87: View from bluff of the Shoals in the Tennessee River and construction work beginning on Wilson Dam (No Date)Add to your cart.
Item 88: A look along a portion of concrete wall of Wilson Dam (No Date)Add to your cart.
Item 89: Extended view of the construction site of Wilson Dam (No Date)Add to your cart.
Item 90: A few steamboats travelling the Tennessee River (No Date)Add to your cart.
Item 91: Workers stand and watch cement pour (No Date)Add to your cart.
Item 92: Work continues to ensure cement gets poured on time (No Date)Add to your cart.
Item 93: A work site to behold (No Date)Add to your cart.
Item 94: A bluff view of spillway construction (No Date)Add to your cart.
Item 95: Crane work continues on Power House Section of Wilson Dam (No Date)Add to your cart.
Item 96: A view from the back side of construction (No Date)Add to your cart.
Item 97: View of Power House section showing forms concrete in place on blocks 83, 81, 79, and 77. Pouring concrete in block 83 (September 30, 1922)Add to your cart.
Item 98: Powerhouse Section-Upstream view of abutment section (August 4, 1924)Add to your cart.
Item 99: Smoke billows out of smoke stacks as work continues on Wilson Dam {direction-North} (No Date)Add to your cart.
Item 100: Progress on Wilson Dam with a view of the houses located on the other side of the Tennessee River (No Date)Add to your cart.
Item 101: View of the railroad tracks that carry the products needed to continue construction on Wilson Dam (No Date)Add to your cart.
Item 102: Men taking a break as a crane delivers needed materials for construction (No Date)Add to your cart.
Item 103: Men taking a break as a crane delivers needed materials for construction (No Date)Add to your cart.
Item 104: Power house Coffer No. 6-View showing forms in power house, reinforcing rods around the penstocks. Forms for draft tube in foreground (January 7, 1923)Add to your cart.
Item 105: View showing draft tube forms for unit #3 being erected (December 5, 1922)Add to your cart.
Item 106: View taken from north end of block 40 showing progress of 12’ piers (March 1, 1923)Add to your cart.
Item 107: View taken from north end of block 40 showing progress of 12’ piers (March 1, 1923)Add to your cart.
Item 108: Power House section Unit #7-General view interior draft tube chamber (February 16, 1924)Add to your cart.
Item 109: Power House section Unit #3-view of cone-first type constructed (February 18, 1924)Add to your cart.
Item 110: Power House Section Concrete piers for supporting forms for draft tube #1 (March 27, 1924)Add to your cart.
Item 111: View taken from bluff north side showing progress of north abutment (March 1, 1923)Add to your cart.
Item 112: View taken from bluff north side showing progress of north abutment (March 1, 1923)Add to your cart.
Item 113: View shows progress of 12’ piers-taken from block 40 looking north (March 1, 1923)Add to your cart.
Item 114: View shows progress of 12’ piers-taken from block 40 looking north (March 1, 1923)Add to your cart.
Item 115: Interior view of powerhouse showing floor cleaning apparatus (February 28, 1927)Add to your cart.
Item 116: Men studying a portion of concrete during construction of Wilson Dam (No Date)Add to your cart.
Item 117: Inside view of power house section (No Date)Add to your cart.
Item 118: Another view of the inside of power house section (No Date)Add to your cart.
Item 119: Another view of the inside of power house section (No Date)Add to your cart.
Item 120: A view of the inside of power house section with men working in different sections (No Date)Add to your cart.
Item 121: View of Wilson Dam construction with spillway and power house sections (No Date)Add to your cart.
Item 122: Tennessee River Wilson Dam Construction Equipment-General Plan and Elevations (1921)Add to your cart.
Item 123: Extended view of men working on constructing turbines for dam (No Date)Add to your cart.
Item 124: Close-up view of construction of turbines (No Date)Add to your cart.
Item 125: Pouring concrete (No Date)Add to your cart.
Item 126: Close-up view of turbines in power house section of Wilson Dam (No Date)Add to your cart.
Item 127: A man surveys a distance while others look on (No Date)Add to your cart.
Item 128: Extended view of men working to pour concrete in power house section (No Date)Add to your cart.
Item 129: Work continues on one turbine section of Wilson Dam (No Date)Add to your cart.
Item 130: A look at progress on one turbine in Power House section (No Date)Add to your cart.
Item 131: A man takes a break on working on one of the turbine sections of Wilson Dam (No Date)Add to your cart.
Item 132: Continuing work on turbines (No Date)Add to your cart.
Item 133: Close-up of part of turbine (No Date)Add to your cart.
Item 134: An inside look into one of the turbine sections of Wilson Dam (No Date)Add to your cart.
Item 135: A man studies the outside work of one of the turbines (No Date)Add to your cart.
Item 136: Another view of a turbine section of Wilson Dam (No Date)Add to your cart.
Item 137: More work for this section of the Power House section (No Date)Add to your cart.
Item 138: A few turbines are almost completed (No Date)Add to your cart.
Item 139: Two men inspecting the work area of this section of the Power House section of Wilson Dam (No Date)Add to your cart.
Item 140: Another look inside a turbine (No Date)Add to your cart.
Item 141: Two men stand and chat for a minute while working in a section of the Power House (No Date)Add to your cart.
Item 142: A long drop from this vantage point (No Date)Add to your cart.
Item 143: A different view of the continued progress of the turbine section of Wilson Dam (No Date)Add to your cart.
Item 144: A wider look at the construction on the Power House section of Wilson Dam (No Date)Add to your cart.
Item 145: A view from the bluffs (No Date)Add to your cart.
Item 146: Taking a break (No Date)Add to your cart.
Item 147: Power House Section-General view of power house taken from top of bluff, south side (January 19, 1923)Add to your cart.
Item 148: Power House Section-General view of power house taken from top of bluff, south side (January 19, 1923)Add to your cart.
Item 149: Another look from the bluff, south side of the Power House section of Wilson Dam (No Date)Add to your cart.
Item 150: Another look from the bluff, south side of the Power House section of Wilson Dam (No Date)Add to your cart.
Item 151: Progress on Power House section of Wilson Dam (No Date)Add to your cart.
Item 152: The look of progress (No Date)Add to your cart.
Item 153: A view from the tracks of sections of the spillway of Wilson Dam (No Date)Add to your cart.
Item 154: A man sits and takes a break from working on spillway (No Date)Add to your cart.
Item 155: A close-up of the construction of the spillway of Wilson Dam (No Date)Add to your cart.
Item 156: What a view (No Date)Add to your cart.
Item 157: A man looks over construction of the spillway (No Date)Add to your cart.
Item 158: Work continues on the spillway with a look at what would become Wilson Lake in the background (No Date)Add to your cart.
Item 159: Men stop and pose for a picture during construction (No Date)Add to your cart.
Item 160: A look at construction of Wilson Dam from a different angle (No Date)Add to your cart.
Item 161: No job is too hard for these guys (No Date)Add to your cart.
Item 162: A man walks through the lumber yard during construction of Wilson Dam (No Date)Add to your cart.
Item 163: Construction would not be complete without a few cranes (No Date)Add to your cart.
Item 164: Getting the cranes ready to start construction (No Date)Add to your cart.
Item 165: Assembling the crane takes a lot of workers (May 26, 1920)Add to your cart.

Browse by Box:

[Box 1],
[All]


Page Generated in: 0.077 seconds (using 195 queries).
Using 2.84MB of memory. (Peak of 3.16MB.)

Powered by Archon Version 3.21 rev-3
Copyright ©2017 The University of Illinois at Urbana-Champaign